#Roles & Responsibilities:
• To support Wanda project/ATS Engineering team.
• To be the technical contact window (ATS subsystem) with BGL during Field testing
stage.
• To provide ATS Technical PPT/Data preparation. (Documentation skill)
• Coordination with Customer (D3 & SEMPO& TRTC & Sub-system leaders)
• To escalate the clear request for further software modification with Engineering
team.
• To record all the ATS Software baseline for each train.
• To organize bi-weekly meeting between BGL-ATS design team & Local ATS team.
• Provide the weekly report to T&C Manager and Project Manager.
• To produce T & C procedures of ATS sub-system, such as SIT10/SIT11/SIAT2 CC~
EMU on board test
• To Prepare ATS tools & ATS Commission spare list.
• To Build the OCS Wireshark decoder to hook all of communication bridge
between ATS, DCS, CBI, MSS sub-system. (As an OCS data logger to storage all of
bit map data)
#Performance Measurement:
• To deal with TRTC on ATS interface requirement, such as communication bits &
Com interface requirements.
• To support OCS ATS design docs between interface requirement spec.
• As ATS expert to reply with SEMPO & TRTC & STO &BGL for technical
responses/queries.
• To support the WANDA-CBI Field testing activities.
• To analysis the ATS even logs for trouble shooting needed.
• As ATS expert to provide the ATS training courses to co-worker and Customer.
• To deal with E & M consortium team on Dynamic routes for WD mainline usage
purposes & provide the dynamic route chart for most of the Train carousal loop
operation during EMU Dynamic Test stage.